CALENDAR REFORM
(due to various delays)
HANDOVER FOR HEATING & AC FACILITIES
Before class-time.
It should include (at least) the following for each of the parts:
Hydronic Heating (for dwellings) and
Air Conditioning (mixed water-air for little rooms & whole air for the big ones).
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct connections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.
PARTIAL CLASS TIME: AIR CONDITIONING SYSTEMS
- We will finish with some complements for this topic.
EXERCISE: VHAC Systems
- At 13:30 we will begin with the (compulsory) exercise for the 2nd part :"VHAC" that is going to last for about one hour.
-Doing it in English is optional.
-It would be about concepts & drawings derived from classes.
-No documentation is to be used.
-Bring drawing material with you (color pens, etc.).
-Bring two blank A3 copies of the canvas of your proposal.
No hay comentarios:
Publicar un comentario