viernes, 29 de noviembre de 2013

FOR NEXT THURSDAY 2013 12 05: HSW Handover, Exercise, Questions & Answers.

HANDOVER: 2.3 HOT SANITARY WATER & CSW & DRAINAGE
- Before class time, in one pdf, and in landscape orientation please.

INCLUDING (minimum content):
- A report explaining & justifying your solution (in just one A-4 format each).
Preliminary sketches of the whole solution.
- A sample of the calculations (in just one A-4 format each).
Constructive Plans & Details and a view of a significative part of your proposal (like for example a bathroom), with sufficient detail for you to show the possibility to build it.
- Must include the coordination of facilities: Drainage (in green& brown), Cold Water (in blue) and Hot Water (in orange& yellow), and also with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and water resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.

Some of your HSW proposals will be reviewed at the beginning of the class

EXERCISE: Design & VHAC & Salubrity Systems

- At 12:30 we will begin with the (compulsory) exercise for the whole course, that is going to last for about one and a half hour.
-Doing it in English is optional.
-It would be about concepts & drawings derived from classes.
-No documentation is allowed to use.
-Bring drawing material with you (color pens, etc.).
-Bring three blank A3 copies of the canvas of your proposal.


- After the exercise we will continue with a (voluntary) time dedicated to solve personal & cosmic doubts.

sábado, 23 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 29: CSW HANDOVER & HSW CLASS

HANDOVER: 2.2 Cold.Sanit.Water

INCLUDING THE FOLLOWING MINIMUM CONTENT:
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches (sufficient for being able to calculate it).
- A sample of the calculations done for a representative part (in just one A-4 format).
- Plans that must include the Cold Water (in blue) facilities reflecting dimensions & diameters, and coordinated with Drainage (in green & brown) and the rest of spaces upon the building´s plans (grayed).
- You can always change & improve your work, modifying parts of your building if necessary.
- Send it before class time, in one pdf, and in landscape orientation please.

CLASS:
We will proceed with the next topic 3.3  Hot Sanit.Water Facility. Please bring your A3 Canvas and the CTE & Notes from last course.

sábado, 16 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 21: DRAINAGE HANDOVER & CSW CLASS


HANDOVER: 3.1 Drainage

INCLUDING:
- A brief report explaining & justifying your drainage solution: type & layout & materials employed (in just one A-4 format).
Plans that must include the coordinated Drainage Facility (in green& brown color) with the sewage system (just one connection for the building) and the rest of spaces & structure & foundations depicted in the building´s plans (grayed).
The dimensioning of pipe diameters and other important elements should be reflected on the plans.
Send before class time, in just one pdf please.



CLASS-TIME

- We will begin with the Cold Sanitary Water solution
- Please bring a paper copy of the A3 canvas of your building proposal to work in class.

viernes, 8 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 14: VHAC HANDOVER & REWIEW & DRAINAGE

HANDOVER FOR THE COMPLETE VHAC FACILITIES

Before class-time.
It should include (at least) the following for each of the parts:
Ventilation (for garages & dwellings)
Hydronic Heating (for dwellings ) and
Air Conditioning (mixed water-air for little rooms & whole air for big ones).

- A report explaining & justifying your solution (in just one A-4 format).
Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


CLASS TIME (1/2): REWIEW OF THE VHAC WORKS

- We will cast & examine some of the works submitted.


CLASS TIME (1/2): DRAINAGE

- We will begin with the explanation of these topics.

- Don´t forget to bring your A3 Canvas to work afterwards.

lunes, 4 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 07: CALENDAR / AIR CONDITIONING SYSTEMS / NEXT HANDOVER

CALENDAR REFORM
(due to the past strike)



CLASS TIME: AIR CONDITIONING SYSTEMS

- We will continue with the explanation of those topics.
- Don´t forget to bring your A3 Canvas to work afterwards.

HANDOVER FOR THE COMPLETE HVAC FACILITIES

- Is programed for Nov.14th, but do not leave everything for the last moment as it will include the following:

- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities: Ventilation (for garages & dwellings), Hydronic Heating (for dwellings ) and Air Conditioning (mixed water-air for little rooms & whole air for big ones), and also with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


THOSE OF YOU THAT SEND ME SOMETHING IN ADVANCE FOR NEXT THURSDAY WILL HAVE THEIR WORK PROJECTED & DISCUSSED IN CLASS.