jueves, 23 de abril de 2015

FOR NEXT THURSDAY 2015 04 30: DRAINAGE HANDOVER & CSW

HANDOVER: 3.1 Drainage
INCLUDING:
- A brief report explaining & justifying your solutions: type & layout & materials employed (in just one A-4 format).
Plans that must include the coordinated Drainage Facility (in green& brown color) with the sewage system (just one connection for the building) and the rest of spaces & structure & foundations depicted in the building´s plans (grayed).
The dimensioning of pipe diameters and other important elements should be reflected on the plans.
Send before class time, in landscape pdfs please.
- You can always change & improve your work, modifying parts of your building if necessary.

CLASS-TIME: Cold Sanit.Water

- We will begin with the Cold Sanitary Water solution


- Please bring a paper copy of the A3 canvas of your building proposal to work in class.

sábado, 18 de abril de 2015

FOR NEXT THURSDAY 2015 04 23: DRAINAGE

CLASS-TIME

- We will begin with the DRAINAGE solution
- You can send me in advance your ideas if you want to be discussed in public
(that will be considered as a positive merit for your future marks).


- Please bring a paper copy of the A3 canvas of your building proposal to work in class.

sábado, 11 de abril de 2015

FOR NEXT THURSDAY 2015 04 16: CALENDAR / AIR CONDITIONING SYSTEMS / HANDOVER

CALENDAR REFORM
(due to various delays)


HANDOVER FOR HEATING & AC FACILITIES

Before class-time.
It should include (at least) the following for each of the parts:
Hydronic Heating (for dwellings) and
Air Conditioning (mixed water-air for little rooms & whole air for the big ones).

- A report explaining & justifying your solution (in just one A-4 format).
Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct connections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


PARTIAL CLASS TIME: AIR CONDITIONING SYSTEMS

- We will finish with some complements for this topic.


EXERCISE: VHAC Systems
- At 13:30 we will begin with the (compulsory) exercise for the 2nd part :"VHAC" that is going to last for about one hour.
-Doing it in English is optional.
-It would be about concepts & drawings derived from classes.
-No documentation is to be used.
-Bring drawing material with you (color pens, etc.).
-Bring two blank A3 copies of the canvas of your proposal.