HANDOVER FOR THE COMPLETE H&AC FACILITIES
Before class-time.
It should include (at least) the following for each of the parts:
Hydronic Heating (for dwellings) and
Air Conditioning (mixed water-air for little rooms & whole air for big ones). In a tentative way to be corrected at class for those of you that do this work (optional)
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.
CLASS TIME (1/2): REWIEW OF THE HEATING & AC WORKS
- We will cast & examine some of the works submitted.
CLASS TIME (1/2): AIR CONDITINING
- We will begin with the explanation of these topics.
- Don´t forget to bring your A3 Canvas to work afterwards.
No hay comentarios:
Publicar un comentario