miércoles, 29 de marzo de 2017

FOR NEXT TUESDAY 2017 04 18: SALUBRITY SUBMISSION

HOMEWORK & HANDOVER


2 SALUBRITY:
DRAINAGE & COLD SANITARY WATER & HSW with SOLAR BACKUP.

Submit your work from now on till April 18 before class time, in one pdf, and in landscape orientation please.

INCLUDING (minimum content):
- A report explaining & justifying your solution (in just one A-4 size format each).
Preliminary sketches in plans & sections, or perspective of the whole solution including
the technical plants at the bottom (boiler rooms, etc), and top (deck) and a…
-View of a significative part of your proposal (like for example a bathroom), with sufficient detail to show the possibility to build it (see examples at blog pictures).
- Must include the coordination of facilities: Drainage (in green& brown), Cold Water (in blue) and Hot Water (in orange& yellow), and also with the rest of spaces upon the building´s plans (grayed).
- A sample of the calculations (in just one A-4 size format each).
- You can always change & improve your previous decisions, modifying parts of your building if necessary.

Send me your work via e-mail to: 
albertotroconiz@gmail.com
reflecting in the title:
Exp.Number-Your Name- 2. SALUBRITY.

we will project & discuss some of yours in public.



martes, 28 de marzo de 2017

EXERCISE & HOT SANITARY WATER & SOLAR LINKS

EXERCISE:
- At 9:00 we will begin with the (compulsory) exercise for all the Salubrity contents that is going to last for about one and a half hour.
-It would be about concepts & drawings derived from classes.
-No documentation is to be used.
-Bring drawing material with you (color pens, etc.).




Here are the links (only for my pupils) to
HOT SANITARY WATER
SOLAR HWS

viernes, 3 de marzo de 2017

FOR NEXT MONDAY 2017 03 06 BUILDING DESIGN ADEQUACY

HOMEWORK & HANDOVER
1.0 Building Design Adequacy
- Before class time, in one (combined) pdf, weighting no more than aprox.10 MB, and in landscape orientation please.
INCLUDING: the most important points appliable to your project from the following list


The intention of all that is to be conscious of the preliminary determinants for the building project that affects from the very first stages of its design.

YOU CAN HAVE A LOOK AT THESE LINKS HERE

BUILDING AS THE PREVIOUS INSTALLATION



Send me your work via e-mail before class next monday to: 
albertotroconiz@gmail.com
reflecting in the title:
Exp.Number-Your Name- 1.0 Build.Des.Adeq.
we will project & discuss some of yours in public.

CLASS
We will begin with the Salubrity topics.