lunes, 26 de diciembre de 2011

CHRISTMAS OFFER

This is a message for those of you that feel not to have enough level to pass the course, and fear to have to go to the exam, so would like to prepare it the sooner the better.
For the first 10 or 12 of you that really feel the need, I will try to make the effort to send by e-mail the marks tomorrow or on Wednesday.

Please ask for it those of you that really feel unsure (e-mail me today or before noon tomorrow). As I have to go abroad for a week, the rest must wait till the allotted date before the 9th of January (although I will try to post it sooner at this blog).

For everyone I wish a

! MERRY CHRISTMAS & HAPPY NEW YEAR !
Alberto


lunes, 5 de diciembre de 2011

FOR NEXT THURSDAY 15 Dec.2011


HANDOVER: 2.3 AIR CONDITIONED
- Plans with dimensions & specifications (sufficient for being able to build it).
- Must include the coordination with the rest of VHAC facilities (follow colour codes) & structure upon the building´s plans (grayed).
- You can always change & improve your previous work, modifying parts of your building if necessary.
- Before class time, in one pdf, and in landscape orientation please.

OPTIONAL EXTRA WORK
a/ HANDOVER: 1.5 PLUMBING PLUS
- You can change & improve your previous Salubrity work, modifying or completing parts of it that you consider necessary.
- Before class time, in one pdf, and in landscape orientation please.
- Include it in a different mail from above
- Please explain briefly in the mail the content of your modifications. Only new ones. Don´t repeat things already sent.

b/ MISCELANEA
- Good "apuntes" in English?.  Dictionary of technical terms?. Let me know about extra things you have done, and can be useful for future courses.  It can count!.


EXERCISE: 
- At 12:15 will begin the (compulsory) exercise that is going to last for about one hour.  It would be about concepts & drawings derived from classes and conferences. No documentation is to be used. Bring drawing material with you (color pens, etc.).


Q&A SESSION 
- After the exercise, for those interested we can have a question & answer time about every kind of topic, technical or otherwise.

IMAGES:

The VHAC Image Album you can access directly from HERE

TRY TO AVOID THE FINAL EXAMINATION!

sábado, 19 de noviembre de 2011

FOR NEXT THURSDAY 24/11/2011


HANDOVER: 2.2 Heating
- Plans with dimensions & specifications (sufficient for being able to build it).
- Must include the coordinated plans for the heating of dwellings, boiler rooms, and chimney stacks.
- You can always change & improve your previous work, modifying parts of your building if necessary.
- Before class time, in one pdf, and in landscape orientation please.

CLASS: 
- WE will Begin with the next facility "AIR CONDITIONED".

CONFERENCE: 
- At 13:30 we will attend a (compulsory) conference about the
"EFICIENCIA ENERGÉTICA EN INSTALACIONES DE CLIMATIZACIÓN".


IMAGES:
The VHAC Image Album you can access directly from HERE


viernes, 4 de noviembre de 2011

FOR NEXT THURSDAY 10/11/2011


HANDOVER: 2.1 Ventilation
- Plans with dimensions & specifications (sufficient for being able to build it).
- Must include the coordinated plans for the ventilation of dwellings, storage rooms (trasteros), and garage
- You can always change & improve your previous work, modifying parts of your building if necessary.
- Before class time, in one pdf, and in landscape orientation please.

CLASS: 
- WE will Begin with the next facility "HEATING".


CONFERENCE: 
- At 13:30 we will attend (compulsory) a conference about the "Insulation of the Building Thermal Envelope".


IMAGES:
The VHAC Image Album you can access directly from HERE


viernes, 21 de octubre de 2011

FOR NEXT THURSDAY 27/10/2011


HANDOVER: 1.3 Drainage
- Plans with dimensions & specifications (sufficient for being able to build it).
- Must include the coordinated Cold Water (in blue) & Hot Water (red, orange, yellow,…) and Drainage (green, brown,…) facilities upon the building´s plans (grayed).
- You can always change & improve your previous work, modifying parts of your building if necessary.
- Before class time, in one pdf, and in landscape orientation please.


EXERCISE: 
- At 12:15 will begin the (compulsory) exercise that is going to last for about one hour.  It would be about concepts & drawings derived from classes and conferences. No documentation is to be used. Bring drawing material with you (color pens, etc.).

IMAGES:
The Salubrity Image Album you can access directly from HERE

jueves, 13 de octubre de 2011

CONFERENCIA DEL 13/10/2011






Esta  se repetirá para los alumnos de la tarde el próximo jueves 20/10/20011 a las 20h
(confirmado)


MUESTRA DE ILUSTRACIONES
El detalle de algunas de las imágenes de la conferencia se pueden ver AQUÍ

domingo, 9 de octubre de 2011

FOR NEXT THURSDAY 13/10/2011


HANDOVER: 1.2 Hot.Sanit.Water
- Plans with dimensions & specifications (sufficient for being able to build it).
- Must include the coordinated Cold Water (in blue) and Hot Water (red, orange, yellow,…) facilities upon the building´s plans (grayed).
- You can always change & improve your previous work, modifying parts of your building if necessary.
- Before class time, in one pdf, and in landscape orientation please.

CONFERENCE: 
- After the first to hours dedicated to the Drainage Facility, we will go to the auditorium with the rest of the groups to attend…


sábado, 1 de octubre de 2011

NEW IMAGES POSTED

IMAGES
The Salubrity Image Album you can access directly from HERE
REMINDER
For class work: please do not forget to bring your A3 Format and Documentation ("Apuntes" & Tech.Code).


(OFF THE RECORD
I feel sorry for that little boy running on an sloppy floor in his bombarded house)

sábado, 17 de septiembre de 2011

NEXT HANDOVER: 21/09/2011

0.1 Card & Building Proposal
1.1 C.S.Water (Preliminary Sketch)

 (Before class time, in two separate pdf´s, and in landscape orientation please.)

LINKS

Please note the change of the Blog address.


The initial Image Album you can access directly from HERE