lunes, 28 de abril de 2014

FOR NEXT THURSDAY 2014 05 08: HANDOVERs & DRAINAGE & CWS

HANDOVERs: 3.1 Drainage & 3.2 Cold Sanit.Water
INCLUDING:
- A brief report explaining & justifying your solutions: type & layout & materials employed (in just one A-4 format).
Plans that must include the coordinated Drainage Facility (in green& brown color) with the sewage system (just one connection for the building) and the rest of spaces & structure & foundations depicted in the building´s plans (grayed).
The Cold Water (in blue) facilities reflecting dimensions & diameters, and coordinated with Drainage
The dimensioning of pipe diameters and other important elements should be reflected on the plans.
Send before class time, in two separated pdfs please.
- You can always change & improve your work, modifying parts of your building if necessary.

CLASS-TIME
In principle if nothing interferes:
- We will begin with the Hot Sanitary Water solution

- Please bring a paper copy of the A3 canvas of your building proposal to work in class.

sábado, 5 de abril de 2014

FOR NEXT THURSDAY 2014 04 10: VHAC HANDOVER & REWIEW & DRAINAGE

HANDOVER FOR THE COMPLETE VHAC FACILITIES
Optional for those to come and want their work to be corrected. The rest can send it past the travel-week.
Before class-time.
It should include (at least) the following for each of the parts:
Ventilation (for garages & dwellings)
Hydronic Heating (for dwellings ) and
Air Conditioning (mixed water-air for little rooms & whole air for the big ones).

- A report explaining & justifying your solution (in just one A-4 format).
Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct connections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


CLASS TIME (1/2): REWIEW OF THE VHAC WORKS

- We will project & examine some of the works submitted.


CLASS TIME (1/2): DRAINAGE

- We will begin with the explanation of these topics.


- Don´t forget to bring your A3 Canvas to work afterwards.