HANDOVER: 2.3 HOT SANITARY WATER & CSW & DRAINAGE
- Before class time, in one pdf, and in landscape orientation please.
INCLUDING (minimum content):
- A report explaining & justifying your solution (in just one A-4 format each).
- Preliminary sketches of the whole solution.
- A sample of the calculations (in just one A-4 format each).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example a bathroom), with sufficient detail for you to show the possibility to build it.
- Must include the coordination of facilities: Drainage (in green& brown), Cold Water (in blue) and Hot Water (in orange& yellow), and also with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and water resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.
Some of your HSW proposals will be reviewed at the beginning of the class
EXERCISE: Design & VHAC & Salubrity Systems
- At 12:30 we will begin with the (compulsory) exercise for the whole course, that is going to last for about one and a half hour.
-Doing it in English is optional.
-It would be about concepts & drawings derived from classes.
-No documentation is allowed to use.
-Bring drawing material with you (color pens, etc.).
-Bring three blank A3 copies of the canvas of your proposal.
- After the exercise we will continue with a (voluntary) time dedicated to solve personal & cosmic doubts.
No hay comentarios:
Publicar un comentario