viernes, 8 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 14: VHAC HANDOVER & REWIEW & DRAINAGE

HANDOVER FOR THE COMPLETE VHAC FACILITIES

Before class-time.
It should include (at least) the following for each of the parts:
Ventilation (for garages & dwellings)
Hydronic Heating (for dwellings ) and
Air Conditioning (mixed water-air for little rooms & whole air for big ones).

- A report explaining & justifying your solution (in just one A-4 format).
Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


CLASS TIME (1/2): REWIEW OF THE VHAC WORKS

- We will cast & examine some of the works submitted.


CLASS TIME (1/2): DRAINAGE

- We will begin with the explanation of these topics.

- Don´t forget to bring your A3 Canvas to work afterwards.

No hay comentarios:

Publicar un comentario