HANDOVER: 1.3 HOT SANITARY WATER & CSW & DRAINAGE
- Before class time, in one pdf, and in landscape orientation please.
INCLUDING:
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches of the whole solution.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example a bathroom), with sufficient detail for you to show the possibility to build it.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example a bathroom), with sufficient detail for you to show the possibility to build it.
- Must include the coordination of facilities: Drainage (in green& brown), Cold Water (in blue) and Hot Water (in orange& yellow), and also with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and water resources.
- It counts positively the proposal of measures in order to save energy and water resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.
1st EXERCISE: Salubrity
- At 12:15 we will begin with the (compulsory) exercise for the 1st part :"Salubrity" that is going to last for about one hour.
-Doing it in English is optional.
-Doing it in English is optional.
-It would be about concepts & drawings derived from classes and conferences.
-No documentation is to be used.
-Bring drawing material with you (color pens, etc.).
-Bring an A3 copy of the canvas of your proposal.
-Bring drawing material with you (color pens, etc.).
-Bring an A3 copy of the canvas of your proposal.
- After the exercise we will continue with a class dedicated to solve personal doubts.
No hay comentarios:
Publicar un comentario