sábado, 23 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 29: CSW HANDOVER & HSW CLASS

HANDOVER: 2.2 Cold.Sanit.Water

INCLUDING THE FOLLOWING MINIMUM CONTENT:
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches (sufficient for being able to calculate it).
- A sample of the calculations done for a representative part (in just one A-4 format).
- Plans that must include the Cold Water (in blue) facilities reflecting dimensions & diameters, and coordinated with Drainage (in green & brown) and the rest of spaces upon the building´s plans (grayed).
- You can always change & improve your work, modifying parts of your building if necessary.
- Send it before class time, in one pdf, and in landscape orientation please.

CLASS:
We will proceed with the next topic 3.3  Hot Sanit.Water Facility. Please bring your A3 Canvas and the CTE & Notes from last course.

sábado, 16 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 21: DRAINAGE HANDOVER & CSW CLASS


HANDOVER: 3.1 Drainage

INCLUDING:
- A brief report explaining & justifying your drainage solution: type & layout & materials employed (in just one A-4 format).
- Plans that must include the coordinated Drainage Facility (in green& brown color) with the sewage system (just one connection for the building) and the rest of spaces & structure & foundations depicted in the building´s plans (grayed).
- The dimensioning of pipe diameters and other important elements should be reflected on the plans.
- Send before class time, in just one pdf please.



CLASS-TIME

- We will begin with the Cold Sanitary Water solution
- Please bring a paper copy of the A3 canvas of your building proposal to work in class.

viernes, 8 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 14: VHAC HANDOVER & REWIEW & DRAINAGE

HANDOVER FOR THE COMPLETE VHAC FACILITIES

Before class-time.
It should include (at least) the following for each of the parts:
Ventilation (for garages & dwellings)
Hydronic Heating (for dwellings ) and
Air Conditioning (mixed water-air for little rooms & whole air for big ones).

- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


CLASS TIME (1/2): REWIEW OF THE VHAC WORKS

- We will cast & examine some of the works submitted.


CLASS TIME (1/2): DRAINAGE

- We will begin with the explanation of these topics.

- Don´t forget to bring your A3 Canvas to work afterwards.

lunes, 4 de noviembre de 2013

FOR NEXT THURSDAY 2013 11 07: CALENDAR / AIR CONDITIONING SYSTEMS / NEXT HANDOVER

CALENDAR REFORM
(due to the past strike)



CLASS TIME: AIR CONDITIONING SYSTEMS

- We will continue with the explanation of those topics.
- Don´t forget to bring your A3 Canvas to work afterwards.

HANDOVER FOR THE COMPLETE HVAC FACILITIES

- Is programed for Nov.14th, but do not leave everything for the last moment as it will include the following:

- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches for the different zone solutions.
- A sample of the calculations (in just one A-4 format).
- Constructive Plans & Details and a view of a significative part of your proposal (like for example an Air-Handler location & duct conections on the deck), with sufficient detail to show the possibility of building it.
- Must include the coordination of facilities: Ventilation (for garages & dwellings), Hydronic Heating (for dwellings ) and Air Conditioning (mixed water-air for little rooms & whole air for big ones), and also with the rest of spaces upon the building´s plans (grayed).
- It counts positively the proposal of measures in order to save energy and natural resources.
- You can always change & improve your previous work, modifying parts of your building if necessary.


THOSE OF YOU THAT SEND ME SOMETHING IN ADVANCE FOR NEXT THURSDAY WILL HAVE THEIR WORK PROJECTED & DISCUSSED IN CLASS.



sábado, 19 de octubre de 2013

FOR NEXT THURSDAY 2013 10 24: HEATING HANDOVER & CLASS


HANDOVER: 2.2 HEATING

MUST INCLUDE:
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches of the solution for dwellings & offices (spatially compartimentated types).


CLASS

We will continue with this topic.
As always: please bring your canvas to work in class.

sábado, 12 de octubre de 2013

FOR NEXT THURSDAY 2013 10 17: VENTILATION HANDOVER & HEATING


HANDOVER: 2.1 VENTILATION

MUST INCLUDE:
- A report explaining & justifying your solution (in just one A-4 format).
- Preliminary sketches of the whole solution.
- Constructive Plans & Details for the garages & storage rooms, with sufficient detail as to show the possibility to build it.
- Must include the coordination with the rest of spaces & structure (beams & pillars) upon the building´s plans (grayed).
- A sample of the calculations one for garages, and another for dwellings (each in just one A-4 format).

- Please conform in your drawings to the color code.
- You can always change & improve your work, modifying parts of your building if necessary.
- Before class time, all in one pdf (should weight no more than 10 Mb), and in landscape (screen) orientation please.

2.2 HEATING

We will begin with this topic.
As always: please bring your canvas to work in class.